Library renovation update - July 2014

23 Jul 2014

Petros Koufopoulos worked on the spouts for the drains from the roof.

 

Metal strips were added to reinforce the concrete slab on the floor of the library.

 

An opening was cut to accommodate a new internal stairway.

 

 

The connection between the floor slab and the sixth century wall was reinforced.

 

 