google-site-verification: google62ccf351b0361241.html

Library renovation update - January 2015

The metal girders were bolted and welded into place. Scaffolding was installed around the outside of the dome. A doorway was created that will connect the central stairwell with the balcony level of the manuscripts storeroom.

Archive